encoding utf-8 survey whirlpool_inlet_rm #input whirlpool_inlet.th2 #map whirlpool_inletMP #whirlpool_inletSP1 #endmap centreline #date 21/11/2024 #team "Robert Middleton" instruments #team "Robert Middleton" notes data normal from to tape compass clino extend right #calibrate compass 2.81 #RM Dive Compass and computer, untagged line, based poorly on body lengths 0 1 1.5 070 11 1 2 2.8 035 -32 2 3 4.0 010 +22 3 4 2 000 -44 4 5 3 050 -26 #j 5 6 4 300 0 6 7 5.5 270 7 7 8 4 290 3 8 9 12 250 6 9 10 2 170 15 #air 10 11 2 195 49 11 12 3 210 -30 12 13 4 190 0 #s2 13 14 2 210 -30 14 15 3 250 19.5 15 16 5 170 10 16 17 1.5 240 -25 17 18 4 210 -5 18 19 2.5 90 -45 18 18a 2 270 0 5 5a 5.5 030 1 5a 5b 2.5 300 -1 5b 5c 4 000 3 5c 5d 6 070 10 #data passage station left right up down #0 0.5 1.8 3 0 ;Surface of Mary Rose airbell at line #1 0.3 0.9 0.8 0 ;Line as it enters inlet sump #2 0.4 0. 0.8 0.3 ;elbow of first short sump #3 0.7 0.7 2.5 0.5 ;1st inlet airbell #4 0.6 0.6 0.7 0.3 ;RH bend #5 2 0.4 0.7 0.3 ;Junction #6 0.5 0.5 0.3 0.3 ;active tube #7 0.35 0.35 0.3 0.3 ;crux of sump #8 0.6 0.6 0.2 0.2 ;Sump becomes low bedding with line traps #9 1 0.5 0.3 0.3 ;Bend to left to air, ahead is mud filled underwater tube #10 0.2 0.6 3 0.5 ;Rift Airbell left wall #11 0.2 0.2 3.5 0 ;Apex of rift at floor level #12 0.6 0.6 1.5 0 ;Start of canal sump 2 #13 0.5 0.5 0 1 ;Inlet sump 2, water level at end of passage #14 1 0.1 0.4 0.4 ;Inlet sump 2 elbow (-1m) #15 0.3 0.7 1 0.5 ;Inlet sump 2 upstream end at water level #16 0.3 1.5 5 0.5 ;Base of aven (choked at top) #17 0.7 0.3 0.6 0 ;Entrance to aven upstream #18 0.5 0.5 3 1 ;Rift #19 0.15 0.15 4 0 ;Water level. Looks passable below if you can get in? Or dig? #data passage station left right up down #18 0.5 0.5 3 1 #18a 0.4 0.4 3 0 #*data passage station left right up down #5 0.6 0.6 0.3 0.3 #5a 0.6 0.6 0.2 0.2 ;inlet sump mud floored, can be dug deeper but surveyed as filled #5b 0.6 0.6 0.3 0.3 #5c 0.6 0.6 0.2 0.2 #5d 0.6 0.6 0.6 0.2 ;End of line, continues beyond low, some small airbells in this section endcentreline endsurvey